Value planning in building design and construction
Value Management (VM) and Value Engineering (VE) are techniques concerned with defining, maximising and achieving 'value for money' (VfM). These are systematic team-based collaborative approaches, initially pioneered in the United States during the Second World War to secure maximum output from limited resources.
VM covers the full range of value techniques that are available and used throughout the duration of a project as part of a continual process. By contrast, Value Planning (VP) refers to value techniques that are applied during the planning phases of a project, or at the early stage of design and development.
VP activities are introduced in the early phases with the intention of defining, clarifying and agreeing a hierarchy of the client’s objectives. This hierarchy identifies the issues and functions that are of particular importance to the client. In general terms, VP is used, first by the client’s team to develop the strategic brief, and later by the extended team to develop the strategic brief into the project brief.
The client’s team undertake the first VP exercise to identify critical stakeholder values in a quantitative way, and prioritise the delivery of those values. This involves identifying business requirements and carrying out options studies and/or analysis. This helps to inform the 'mission statement' and strategic brief.
A VP workshop can then be held with the aim of:
- Developing the strategic brief into the project brief.
- Defining user requirements.
- Identifying project sensitivities and expectations.
- Identifying enhancement opportunities.
For the VP activities to be a success, as with VE, it is important to involve the most appropriate people at the value meetings and workshops. While this will vary according to the project, it is expected that there should be comprehensive representation of all relevant stakeholders in a particular phase of the process. This includes the client and the end users if possible, so they can inform the function analysis and requirement specification.
As VE proceeds, the supply chain and other stakeholders should become involved.
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
The Master Builder: William Butterfield and his times. Book review.
Why construction can't afford to ignore the skills gap.
Building Safety Regulator, 19 August
Gill Kernick appointed Independent Chair of Residents’ Panel.
Connecting knowledge, technology and conservation
Building competence for the future of built heritage.
Building Regulations and Building Safety Act
CIOB publishes free advice for non-domestic clients.
Building Safety Newsletter from MHCLG.
An extraordinary record of steel engineering worldwide.
Households living near new pylons to save on bills.
ECA warns growth must not outpace grid capacity or skills.
The role of the client and decision making
CIOB response to built environment professions call for evidence.
Construction's sustainability reporting revolution
Tracking upfront embodied carbon with digital tools.
ECA welcomes procurement reforms
Public spending must back British jobs and skills.